Frequently asked questions

Answers to the questions most often asked by potential residents of Terezyne Industrial Park. Can't find yours? Write to us.

  • What is an industrial park?

    An industrial park is a defined territory equipped with engineering and transport infrastructure, where residents operate under the terms set by Ukrainian legislation and an agreement with the management company. Residents get a ready site with utilities and tax incentives.

  • Can I build my own plant on the territory of Terezyne Industrial Park?

    Yes. The lease or sublease format with development rights means the resident designs and builds their own production facility. Purchasing a plot or Build-to-Suit construction by the management company are also available.

  • What is the minimum plot size available for lease?

    The total area of the park is 14.9882 ha. The plot size and configuration are selected individually to match the resident's specification. Send a request to the management company to get the available options.

  • Which companies can become residents?

    Manufacturing, processing, warehouse and logistics companies, as well as agri-food businesses. A resident is a business entity that has signed an agreement with the management company on economic activity within the industrial park.

  • How much does it cost to lease a plot?

    The cost of lease, sublease or purchase is formed individually and depends on the area, cooperation format, required utility capacity and the term of the agreement. Prices are not published publicly — contact the management company for a commercial offer.

  • What documents are required to join the park?

    A company registration extract and constituent documents, an investment project description (activity, investment volume, number of jobs), technical requirements for the plot and utilities, and an estimated timeline. The exact list depends on the cooperation format.

  • Is there financial support from the state?

    Yes. Residents of industrial parks are entitled to exemption from import duty and VAT on new equipment, corporate income tax exemption for up to 10 years, land tax exemption and a reduced real estate tax rate, as well as access to grant programmes. The scope depends on local council decisions and current legislation.

  • What utility capacity is available in the park?

    Available electric capacity is 80 MW (two 40 MW transformers), voltage PS-110/35/10. Gas — up to 125,000 m³/h, pipeline diameter 215 mm, high pressure, category 1. The use of solar and wind energy is also planned.

  • When is the first production facility planned to open?

    The project is under development: the park has been established for 30 years, the Concept approved, the management company selected, and an application submitted to the Ministry of Economy of Ukraine for inclusion in the Register of Industrial Parks. Current project status is published in the News section.