• Terezyne Industrial Park

    A thoughtful space where innovations turn into production
    Download the presentation
  • Terezyne Industrial Park
    A thoughtful space where innovations turn into production

    Concept

    A place where industry comes to life and
    a new economy is emerging

    We have:

    Form of ownership
    PRIVATE OWNERSHIP AND RENTAL
    Type of plots
    GREENFIELD
    The total area of the park
    14.9882 ha
    Utility systems
    next to the park

    Construction is planned:

    Industrial buildings
    40 880 sq.m.
    Warehouse buildings
    7 335 sq.m.
    Administrative buildings
    3 047 sq.m.
    Technical buildings
    1 334 sq.m.

    Socio-economic influence

    • Active development of agro-food industry 
    • Increasing the investment attractiveness of the region for both Ukrainian manufacturers and foreign companies
    • Development of innovations and implementation of the latest technologies 
    • Increasing the competitiveness of Ukrainian manufacturers on the domestic and foreign markets
    • Growth of tax revenues
    • Creation of new jobs
    • Development of "green" energy

    Advantages of the park

      • The actual location of the park is the 82nd km of the Kyiv-Odesa highway
      • An extensive network of highways (M05/E95, P32, P04)
      • Operating cargo station "Rotok" on the territory of the industrial park.

      Distances to:

      the city center of Bila Tserkva
      6.5 km
      Bila Tserkva cargo aviation complex
      17 km
      Boryspil airport
      120 km
      the Kyiv city
      82 km

      Entrances to the park:

      M05/E95 — Kyiv – Odesa
      Hrapachanska street, Bila Tserkva city
      Ivan Kozhedub street, Bila Tserkva city
      View on the map
    • Available power: 80 MW (2 transformers of 40 MW each)

      Voltage: PS-110/35/10

      Available capacity: up to 125,000 m³/h

      Pipeline diameter: 215 mm

      Pressure: high

      Category: 1

      The use of solar and wind energy is expected

      At the stage of designing the most optimal solutions for the purposes of the park

    • State incentives

      • Exemption from payment of import duty and VAT when importing new equipment 
      • Exemption from income taxation for 10 years
      • Grant programs for business in Ukraine

      Preferences from local authorities

      • Exemption from payment of land tax
      • Reduction of the real estate tax rate

      Partner support

      • Favorable conditions for financial interaction between park participants
      • Possibilities of using the installment payment service for business
    • POPULATION SIZE
      431 000 PEOPLE
      WORKING POPULATION
      196 000 PEOPLE

      Active cooperation with educational institutions:

      • Expands opportunities for attracting talented young professionals
      • Provides access to the scientific potential of educational institutions
      • Make innovations accessible and new product development.

      Professional cooperation with the Bila Tserkva branch of the Kyiv Regional Employment Center contributes to:

      • Solving staffing needs by holding job fairs for park residents
      • Conducting professional training and retraining of personnel
    • Oil extraction plant, expert in storage and processing of grain and oil crops.

      The manufacturer of Rollton noodles and puree is the company "Mareven Food Ukraine"

      The leading construction company with SIP panels in Ukraine.

      "Demetra" company - specializes in construction, reconstruction and servicing of elevators throughout Ukraine and laser metal processing.

      LLC "R-plast" - pipe factory.

    • Selection of the territory at the request of the resident
      Designing
      Construction of industrial facilities
      Consulting services
      Creation and management of park infrastructure
      Maintenance after project launch

      Limited Liability Company
      «Smart Management Park»

      Have a question? Write us
      By clicking the "Submit" button, I consent to the processing of my personal data in accordance with the Privacy Policy. Privacy policies

    Collaboration

    • Ready plots with utilities connected for your production. Area, term and lease or sublease conditions are agreed individually for each resident’s project.

      Contact us
    • An opportunity to purchase a land plot within the industrial park. Plot size and configuration are selected to match your technical requirements.

      Contact us
    • Build-to-Suit: we design and construct production, warehouse and office facilities to the resident’s specification — from concept to commissioning.

      Contact us
    • Project status

      2025
      • Terezine Industrial Park was established for a period of 30 years by the decision of the initiator of creation - Terezine Industrial Park Limited Liability Company
      • Concept of Terezine Industrial Park approved
      • "SMART MANAGEMENT PARK" Limited Liability Company was chosen as the managing company and an agreement on the creation and operation of the industrial park was concluded
      • An application has been submitted to the Ministry of Economy of Ukraine to include the Terezine Industrial Park in the Register of Industrial Parks
      • Measures were taken to attract funding and build a partner network for the Project
    • Project status
      2026
      • Terezyne Industrial Park was established for a period of 30 years by the decision of the initiator of creation — Terezyne Industrial Park Limited Liability Company
      • The Concept of Terezyne Industrial Park was approved
      • "SMART MANAGEMENT PARK" Limited Liability Company was chosen as the managing company and an agreement on the creation and operation of the industrial park was concluded
      • An application was submitted to the Ministry of Economy of Ukraine to include Terezyne Industrial Park in the Register of Industrial Parks
      • Measures were taken to attract funding and to build the partner network of the Project

      Terezyne Industrial Park — a site for your production in the Kyiv region

      Terezyne Industrial Park is 14.9882 ha of greenfield land at the 82nd kilometre of the Kyiv–Odesa highway, Bila Tserkva district, Kyiv region. The park was established for 30 years by the decision of its initiator, Terezyne Industrial Park LLC; the management company is SMART MANAGEMENT PARK LLC.

      We offer businesses a ready site for production, warehousing or logistics: with utilities connected, convenient access from the M05/E95 highway and its own operating cargo railway station "Rotok" on the park territory.

      Land for lease and sale for production

      Three cooperation formats are available to residents: lease or sublease of a land plot with development rightspurchase of a land plot, and Build-to-Suit construction, where the management company designs and builds the facility to the resident's specification. Plot size and configuration are selected individually.

      Utility infrastructure

      Available electric capacity is 80 MW (two 40 MW transformers, PS-110/35/10). Gas supply — up to 125,000 m³/h, high pressure, category 1, pipeline diameter 215 mm. The use of solar and wind energy is planned, as well as the construction of industrial, warehouse, administrative and technical buildings.

      Logistics and transport connections

      The industrial park near Bila Tserkva has one of the best transport locations in the Kyiv region: 6.5 km to the centre of Bila Tserkva, 17 km to the Bila Tserkva cargo aviation complex, 82 km to Kyiv and 120 km to Boryspil airport. The M05/E95, P32 and P04 road network provides access to the Black Sea ports in the south and to the west of the country.

      Tax benefits for residents

      Industrial park legislation gives residents tangible financial benefits: exemption from import duty and VAT on new equipment, corporate income tax exemption for up to 10 years, land tax exemption and a reduced real estate tax rate. Business grant programmes in Ukraine are also available.

      Workforce and project support

      The region has a population of 431,000, including 196,000 of working age. The management company cooperates with educational institutions and the employment centre, organises job fairs and staff retraining for residents, and supports the project from site selection to maintenance after launch.

      Want to know the terms of joining the park? See the residents section or contact the management company.

      Questions and answers

      • What is an industrial park?

        An industrial park is a defined territory equipped with engineering and transport infrastructure, where residents operate under the terms set by Ukrainian legislation and an agreement with the management company. Residents get a ready site with utilities and tax incentives.

      • Can I build my own plant on the territory of Terezyne Industrial Park?

        Yes. The lease or sublease format with development rights means the resident designs and builds their own production facility. Purchasing a plot or Build-to-Suit construction by the management company are also available.

      • What is the minimum plot size available for lease?

        The total area of the park is 14.9882 ha. The plot size and configuration are selected individually to match the resident's specification. Send a request to the management company to get the available options.

      • Which companies can become residents?

        Manufacturing, processing, warehouse and logistics companies, as well as agri-food businesses. A resident is a business entity that has signed an agreement with the management company on economic activity within the industrial park.

      • How much does it cost to lease a plot?

        The cost of lease, sublease or purchase is formed individually and depends on the area, cooperation format, required utility capacity and the term of the agreement. Prices are not published publicly — contact the management company for a commercial offer.

      • What documents are required to join the park?

        A company registration extract and constituent documents, an investment project description (activity, investment volume, number of jobs), technical requirements for the plot and utilities, and an estimated timeline. The exact list depends on the cooperation format.

      • Is there financial support from the state?

        Yes. Residents of industrial parks are entitled to exemption from import duty and VAT on new equipment, corporate income tax exemption for up to 10 years, land tax exemption and a reduced real estate tax rate, as well as access to grant programmes. The scope depends on local council decisions and current legislation.

      • What utility capacity is available in the park?

        Available electric capacity is 80 MW (two 40 MW transformers), voltage PS-110/35/10. Gas — up to 125,000 m³/h, pipeline diameter 215 mm, high pressure, category 1. The use of solar and wind energy is also planned.

      • When is the first production facility planned to open?

        The project is under development: the park has been established for 30 years, the Concept approved, the management company selected, and an application submitted to the Ministry of Economy of Ukraine for inclusion in the Register of Industrial Parks. Current project status is published in the News section.

      Contact information

      Address

      Ukraine, Kyiv region, Bila Tserkva district, Kyiv - Odesa highway 82 km + 500 m.

      View on the map
      Have a question? Write us
      By clicking the "Submit" button, I consent to the processing of my personal data in accordance with the Privacy Policy. Privacy policies